Partial Building Collapse in Central Madrid Leaves Several Injured and Missing

A partial collapse of a building under rehabilitation in central Madrid has left multiple people injured and missing, drawing a swift response from city leaders and emergency services.

    Key details

  • • Partial collapse of a building on Calle de las Hileras during hotel conversion works.
  • • At least three people injured and four missing following the incident.
  • • Building constructed in 1965, six floors plus basement, 6,745 sqm area.
  • • Madrid officials, including President Isabel Díaz Ayuso and Mayor José Luis Martínez-Almeida, are monitoring the situation closely.

A partial collapse occurred on October 7, 2025, in a building located on Calle de las Hileras, central Madrid, during rehabilitation work to convert it into a four-star hotel. The building, originally constructed in 1965 with six floors and a basement covering 6,745 square meters, had been authorized for hotel conversion by the Madrid City Council in February. A tower crane installation inside the structure was declared in June as part of the ongoing construction project.

The incident resulted in at least three injuries and four people reported missing. The building, which had previously housed offices, was undergoing significant structural consolidation as part of the transformation into a hotel. Emergency services have been actively involved in rescue and recovery operations.

Political leaders have responded swiftly to the event. Isabel Díaz Ayuso, President of the Community of Madrid, alongside Urbanism delegate Borja Carabante and Deputy Mayor Inmaculada Sainz, are present at the site overseeing developments. Madrid's Mayor, José Luis Martínez-Almeida, expressed his concerns on social media and cut short his trip to London to return to Madrid. Reyes Maroto, PSOE spokesperson in the capital, conveyed support for those affected and praised emergency response efforts. Meanwhile, Manuela Bergerot and Eduardo Rubiño, spokespeople for Más Madrid, are following emergency updates closely, hoping for the rapid location of the missing and recovery of the injured.

This building’s rehabilitation project was managed by a construction company that has detailed the work on its official website. Authorities continue to investigate the cause of the collapse as rescue operations proceed.

The community and officials remain deeply concerned as emergency teams work tirelessly to address the aftermath of this tragic event.

This article was translated and synthesized from Spanish sources, providing English-speaking readers with local perspectives.

Source comparison

Number of injuries

Sources report different injury counts: 3 vs 10 injuries

ondacero.es

"resulting in at least three injuries"

as.com

"resulting in at least ten injuries"

Why this matters: The discrepancy in the number of reported injuries (3 in Source 90623 vs 10 in Source 90627) significantly affects the understanding of the severity of the incident. Readers may perceive the situation as more or less critical based on these conflicting figures.

Number of missing individuals

Sources report different counts of missing individuals: 5 vs 4 missing

ondacero.es

"leaving five individuals missing"

as.com

"leaving four individuals missing"

Why this matters: The difference in the number of individuals reported as missing (5 in Source 90623 vs 4 in Source 90627) is significant as it affects the urgency and scale of the search and rescue efforts. This discrepancy could lead to different perceptions of the incident's impact on the community.